Concrete identity testing
Overview
Standard details
CITB has developed this standard in discussion with industry
Duration
1 day of 6 learning hours
Purpose/Scope
The purpose of this standard is to provide the delegate with the knowledge to support the following:
Scope:
- what effects concrete strength and consistence (workability)
- characteristic strength of concrete
- conformity testing of concrete (ready-mixed concrete procedure)
- importance of identity testing (site procedure)
- on site identity testing of concrete – methods
- sampling, consistence, air content, cube casting, storage and testing
- recording and assessing results
- actions in the event of non-compliant concrete
Occupational relevance
Training delivered against this standard would be relevant to the following occupational group(s):
- operative and craft
- supervision
Candidate pre-requisites
There are no delegate pre-requisites as part of this standard, however a basic knowledge of concrete and techniques would be beneficial.
Instruction/Supervision
As a minimum, course trainers must be able to demonstrate that, in relation to this standard, they have:
- an award in education and training (or equivalent, as per requirements for approved training organisations)
- successfully completed training to this standard
- at least 2 years relevant industrial experience
- a verifiable CV
Delivery
Delivery may be in an on or off the job environment.
All materials and equipment must be of a suitable quality and quantity for delegates to achieve learning outcomes and must comply with relevant legislation.
The class size and delegate/trainer ratio must allow training to be delivered in a safe manner and enable delegates to achieve the learning outcomes.
The following delivery methods may be used in the delivery of this standard:
- classroom
This standard is considered to contain 51% or more theoretical learning.
This standard is considered to be set at a basic level.
Assessment
Methods of assessment considered appropriate for training delivered against this standard are:
For the successful completion of training, delegates must complete an end of course practical assessment or knowledge test that measures all learning outcomes and has a pass or fail criteria.
Where this training is assessed using multiple-choice questions, a minimum of 10 questions must be asked and delegates are required to achieve an overall pass mark of at least 80%.
Quality assurance
Assured
Quality assurance against this standard will require initial approval of the training organisation and their content mapped to the standard.
CITB will also conduct an approval intervention, either desk-based or centre visit, to ensure the training organisation can meet the requirements of the training standard.
Approved training organisations (ATOs) will be required to present information on records of training and assessment upon request to CITB for desk-based analysis. They will also be visited annually by the CITB quality assurance team.
Renewal/refresher
There are no mandatory renewal or recommended refresher requirements for this standard.
Classification
Lifetime
(Please note standards using this classification will only be grant aided once per delegate)
Approval date
December 2021
Review cycle
On request or in 3 year(s) from approval date.
Learning outcomes
Learning outcomes The delegate will be able to: |
Additional guidance to support learning outcome
|
list the factors that affect strength |
Cement type, admixtures, water, weather |
list the factors that affect consistence |
Cement type, admixtures, water, weather |
describe test methods |
Sampling, slump, slump-flow, flow table, air content, cube casting and storage |
explain why correct testing procedures are critical |
Effects of poor sampling, curing, storage. Making sure results are valid to avoid unnecessary non-conformance reports |
describe relevance of characteristic strength in relation to identity test results |
Variability of results is a characteristic of concrete. To confirm compliance to a specified strength, the valid results should be assessed correctly |
assess identity test results |
Follow assessment criteria |
recognise non-conforming concrete |
Flag when results are non-conforming |
Additional information about this standard
British Standards:
- BS EN 12350
- BS EN 12390
Concrete Society guidance:
- Concrete Society CA30 Identity testing for strength
- Concrete Society CA31 Identity testing for fresh concrete properties
- Concrete Society On-site series 1 to 12
Health & Safety Executive (HSE) guides:
- Health & Safety at Work etc Act 1974
- Health and safety in construction
- PPE
- PUWER
- COSHH
- RIDDOR
- LOLER
- CDM
- Manual handling
- Noise
- Hand-arm vibration
- Electrical
Legislation
http://www.legislation.gov.uk/:
- Health and Safety at Work etc Act (HSWA) 1974
- The Work at Height Regulations (WHR) 2005
- Work at Height (Amended) 2007
- Personal Protection Equipment (PPE) Regulations 2002
- Personal Protection Equipment (PPE) at Work Regulations 1992
- Provision and Use of Work Equipment Regulations (PUWER) (1998 UK 1999 NI)
- Control of Substances Hazardous to Health Regulations (COSHH )2002
- Lifting Operations and Lifting Equipment Regulations (LOLER) 1998
- Reporting of Injuries, Diseases and Dangerous Occurrences Regulations (RIDDOR ) 1995
- Construction (Design and Management) Regulations (CDM) 2015
- Construction (Health, Safety and Welfare) Regulations 1996
- Manual Handling Operations Regulations 1992 as amended 2002
- Control of Noise at Work Regulations 2005
- Control of Vibration at Work Regulations 2005.
Related standards
- Concrete aggregates awareness
- Concrete polishing
- Concrete strength assessment
- Concrete placing compacting and finishing
- Cold weather concreting
- Identifying blemishes defects and deteriorating concrete
- Introduction to concrete and its constituents
- Insulated concrete formwork
- Industrial concrete flooring laser screeder operator
- Post-tensioning theory and practice refresher
- Post tensioning for supervisors
- Post-tensioning theory and practice
- Reinforced concrete for engineers and supervisors
- Supervision of concrete pumping operations
- Specifying concrete and receiving onsite
- Visual concrete perception practicalities and specifying
How did we do today? Give feedback